This page contains a Flash digital edition of a book.
Siegmann_Stuhr_FREIGHT:Layout 1 19/5/08 11:48 Page 2
REIGHT
nowadays seem to be non-productive The state has to find a compromise configure the railway infrastructure and
in many cases. Still, many waterways when balancing different aspects of a the railway operations. On one hand, it
are not adapted to their size. traffic system, such as in the attractiveness gives concrete requirements for the usable
Nevertheless, the inland vessel is of the market, the costs of the length of train formation tracks and of
increasing its size. For example, it is infrastructure expansion, increasing overtaking points, but on the other hand,
planned to adapt parts of the river maintenance costs and safety issues. the process of forming trains is affected by
Neckar for vessels with a length of This results in a rather complicated this limiting parameter.
135 metres
1
. decision process that leads to some field A train length of 740 metres means 35
a73
Airfreight grows in a scale that tests but to no big changes at all. This is to 50 wagons per train, depending on the
apparently makes giant air freighters why a productivity increase of the freight kind of wagons. This number seems to be
profitable, which in the past only were transport system should be achieved appropriate for the times of steam or
used for military purposes. within today’s boundary conditions or diesel engines. But also the limits of the
a73
Again and again, it is requested to as a consequence of small changes, for antiquated screw coupling and the
increase the railway loading gauge in instance by modifying only one of the pneumatic brake control are achieved with
Europe with the aim of transporting limiting parameters. this limit of length. In order to reduce the
containers in two layers. With the longitudinal forces in the train to a level
existing gauges even Megatrailers or Enlargement of the train dimensions that prevents from derailments or
high-cube containers can only be Today’s limiting boundary conditions breakings of coupling, the total weight of
carried by special wagons under the According to the DB guideline 408 ‘Züge the train and the length has to be limited
contact wire. Double-stack container fahren und Rangieren’(‘Running Trains according to the characteristics of the
cars, which are frequently used in the and Shunting’), which is part of the terms track sections.
USA, require very expensive extensions of usage of the railway network of DB
of the gauge. Trace fees will not be Netz AG, the length of a rake of wagons Longer trains
able to recover the costs. Furthermore, is limited to 700 metres. Including the Freight trains with light goods rarely reach
double-stack container trains could traction units, the total train length can the load limit before reaching the length
only be realised on routes without reach a maximum of 740 metres. This limit. Therefore, it is theoretically possible
contact wire. limiting parameter is employed to to run trains with more than 740 metres
We make
life-critical connections
Connecting trains and connecting the strands of life have much in common. A DNA
strand can have a life-changing impact. Advanced coupling technology can have a life-
saving impact – by absorbing energy. Like DNA researchers, Dellner Couplers excels at
making connections. And as DNA researchers have found, the options seem unlimited!
Compared to an entire train, couplers are deceptively insignifi cant – but operationally
critical. Dellner’s advanced energy-absorbing solutions range from couplers to complete
front ends. But we offer much more. Our High Speed Data Transfer System off ers
unique through-train fl exibility, featuring failsafe multi-redundant communications for on-
train safety, video-surveillance and high-quality infotainment.
Our high-tech rail solutions are designed for the safe management of extreme forces
at high speed (or extreme mass at low speed). Like a dizzying roller-coaster, the DNA
spiral mirrors this delicate balance between innovation and control. Unlike our biotech
colleagues, however, our main concern is to preserve life – not change it.
Dellner Couplers develops innovative and advanced rail systems
solutions for energy management and on-train communications.
A global supplier, with in-house R&D and production, Dellner
WWW.DELLNER.COM
Couplers is a market leader in the fi eld.
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116
Produced with Yudu - www.yudu.com