NORTHERN EUROPE PROFILE: RHK & VR-TRACK LTD
The tunnel has been equipped with a
leaking antenna cable system that allows
links between the official GSM network
(VIRVE) and the GSM-R network.
Emergency phones will be located at
turning points and at intervals of 350
metres in the tunnel and in technical
facilities. Picking up a phone will
automatically connect it to the tunnel
control centre, which will be able to locate
the phone from which a connection
originates. If an emergency phone is
disconnected from the cable network, this
will send an alarm to the control centre.
The tunnel will have a field phone
network for the rescue department.
Ventilation will take place via the
portals of the tunnel when a train pushes a
column of air before it. Smoke exhaust
fans have been located at the portals of
the tunnel and at vertical shafts. Smoke
exhaust systems have been dimensioned
assuming that the air flow is 2 m/s and
that air changes at least three times an
hour in a tunnel segment. To ensure
smoke exhaust, the tunnel will have smoke
curtains that will allow the tunnel to be
Figure 9: Cross-section of the concrete tunnel section of the Savio tunnel
sectioned. Smoke curtains will be closed
manually and locked to the track
operating system has been connected to connection with access tunnels and structure. Ventilation during repair and
the 20 kV network from two directions, vertical shafts and at turning points in the maintenance work will be carried out with
so a defect in one direction will not cause longest tunnel segments. Power current smoke exhaust fans or auxiliary fans.
a long outage. The 20 kV wire has been distribution boards for maintenance and The tunnel will have an emergency
installed into the track substructure and rescue activities have been located at the earthing system to protect rescue and
fire protected. Transformers and main portals and at intervals of approximately maintenance activities. The system will
distribution boards have been located in 100 metres in the tunnel. ensure that electricity is turned off if
rescue department personnel have to enter
the tunnel during an emergency.
Grounding separators will be located in
connecting structures and the operating
panel will be on the side of the connecting
structure. The panel will have a display
that shows whether electricity has been
turned off.
The Savio railway tunnel will be
equipped with a fire hydrant network and
the fire water network will be a dry
network. Fire water stations will be
located at the portals of the tunnel and at
the top of vertical shafts for pressurising
and filling the network. Fire hydrants will
be located in the tunnel at intervals of
approximately 100 metres. Portable fire
extinguishers will be installed at pumping
Figure 10: Conceptual view of the door at the southern portal of the tunnel
plants, vertical shafts and distribution
36 EUROPEAN RAILWAY REVIEW
l
ISSUE 3
l
2008
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116