NORTHERN EUROPE PROFILE: RHK & VR-TRACK LTD
Figure 1: Location of the Vuosaari Harbour and main cargo routes
a73
The VUOLI project, which includes The harbour project will have a total Porvarinlahti Bay and the Labbacka
the Finnish Road Administration, the cost of approximately €680 million, broken Natura 2000 area in a 1.6km tunnel with
Finnish Rail Administration and the down as shown in Figure 4 on page 32 . double lanes in separate tubes that are
Finnish Maritime Administration, is in well illuminated. The road was opened to
charge of planning and building traffic Traffic connections traffic in December 2007.
channels (harbour road, harbour In planning the harbour project, The new 19km railway line will
railway line and fairway). The VUOLI environmental considerations have played improve rail connections for cargo traffic.
project will pay 50% of the costs of a key role and new traffic channels have It will provide a fast and safe link to the
traffic channels and the Port of been located in tunnels or in existing main line between Helsinki and Tampere
Helsinki 50% corridors for the most part. New road and and inland terminals along the way. The
railway connections will link the harbour railway line will be completed and go into
This is the first time the Finnish Road to major roads and the main railway line service in November 2008.
Administration, the Finnish Rail (see Figure 5 on page 32).
Administration and the Finnish The fairway leading to the harbour, Construction on the
Maritime Administration have worked with a draught of 11 metres and a length environment's terms
together to such an extensive degree in the of 36km, was planned so as to be as safe The harbour and new traffic channels run
same project. The VUOSA and VUOLI and easily navigable as possible. Dredging through areas that have considerable
projects have been carefully coordinated. was required over a distance of 2km, and importance for nature conservation and
Joint functions include the handling of soil dredged soil and rock was mostly used to recreation, and extensive environmental
and rock, communications, site traffic fill in the harbour area. impact assessments were conducted in
arrangements and the monitoring of The new harbour road (Satamatie) planning the project and as part of the
environmental impacts. leading to Ring Road III goes under permit and notification procedure. In
planning and approving the Vuosaari
Harbour and traffic channels for it,
attention has constantly been paid to
environmental impacts as well as financial
and technical matters, and this has
essentially influenced planning solutions.
In building the harbour road and
railway line, the moving of soil and rock
has been coordinated with the
construction of the harbour, fairway and
logistics area to provide the optimal
solution in terms of overall economy. The
harbour road and railway line follow the
same corridor between tunnels and their
construction has been carried out together.
This also saved space and made it easier to
plan noise abatement and landscaping.
Figure 2: Project Timetable
Construction of the Porvarinlahti railway
30 EUROPEAN RAILWAY REVIEW
l
ISSUE 3
l
2008
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116