This page contains a Flash digital edition of a book.
72-73 ENERGY:SPN Master pages 13/9/08 01:08 Page 3
spnfeature
Clifton Lido in Bristol was left lying empty and decaying for Architects worked with English Heritage to make sure the lido had
almost twenty years and was in a serious state of decay firm footings in the past by being sympathetic to its original design
aim to strip away all the “This has been a
pretentiousness of the challenging and fascinating ENERGY IDEAS FROM THE CLIFTON LIDO
modern spa culture and offer project; a real labour of love. • TheLidohasalargesolarhotwaterheatingsystemwithatarget
a genuine and value for This was a rare opportunity to of obtaining 75% of heated water requirement using solar
money package to suit the turn a historic, listed building vacuumtubecollectors
needs of city dwellers.” in the centre of a city into • Water from the roofs will be collected in a separate tank and
Arne Ringner of the Glass something unique and afterithasbeentreateditwillbere-usedinthepool
Boat Company said: “This was relevant to people today,” • The pre-swim shower units are being supplied with warm and
a rare opportunity to turn a said Arne. filtered overflow water from the pool thus saving vast
historic, listed building in the Architects have worked volumes of water
centre of a city into with English Heritage to • Allbuildingsareinsulatedanddoubleglazed
something unique and ensure that this landmark • Therestaurantterracewillbeglazedandratherthanrunningair-
relevant to people today. restoration project has firm conditioning units the lido will extract the heat and re-use it to
“We have a vision of the footings in the past, present heatthepool
Lido being very accessible as a and future by being • Theventilationairfromtherestaurant,kitchen,heatingplantand
social hub for local people and sympathetic to the original changing rooms will be passed through a handling unit with a
as a destination for people design. As a nod to the past, heatpumpaimedatrecovering80%ofallextractheatforre-use
from further afield who are curtained changing cubicles
curious to see how a 19th will line the poolside but
century Lido can be adapted swimmers will be fully
to modern life.” immersed in the future in an
Now there’s not only an infinity edge pool and hot tub
infinity pool heated by state of comfortably heated to 35
the art green technology to degrees with innovative green
enjoy, there’s a spa that will technology that has already
offer massages and other attracted praise from the Low
restorative remedies. Carbon Trust.
Built circa 1850 when Reclaimed material has also
Clifton was still largely been used where possible and
grazing land, the lido is now this includes an oak staircase
surrounded by Edwardian from the now demolished
terraces in a hidden corner of Bristol and West tower in the
the ‘village’. The Lido closed city centre.
circa 1990 and was The staircase leads to a 90
controversially sold off by seat restaurant with a wall of
The lido has sold a third of the available subscriptions to the pool to
Bristol City Council to windows looking over the
give unlimited access to committed regular swimmers
housing developers. The pool. A Valorium wood-fired
following 13 years saw the oven has been imported from
local community campaign Florence to give a blast of
against the development and authenticity to the menu.
“WE AIM TO STRIP AWAYALL
the battle for the baths was Downstairs, the poolside café
won in 1998 when the Grade will serve an express version
THE PRETENTIOUSNESS OF
II* listing was awarded, of the main menu and will
elevating the lido’s status to serve pool users and the
THE MODERN SPA CULTURE
the top 6% of listed buildings general public.
in the country. The pool will be open all
AND OFFER A GENUINE
It was at this stage the Glass year round and will close daily
Boat Company got involved at 10pm so it will always be at
AND VALUE FOR MONEY
and Full Planning Permission the hub of the facility and
for the restoration of the pool create a unique focus for
PACKAGE TO SUIT THE
and associated buildings was visitors to the café and
granted in 2006. restaurant. spn
NEEDS OF CITY DWELLERS”
Visit our website at www.swimmingpoolnews.co.uk
a174a174a174
OCTOBER 08 swimming pool news 73
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100
Produced with Yudu - www.yudu.com