BFLNov.08 19/11/08 12:30 pm Page 66
commercial hvac
Maintaining
room comfort
year-round
KAPLAN Financial’s four new city centre
training rooms are in Cotton House in
Liverpool, a 1960s office development
that replaced the original 1906 Cotton
Exchange building. The additional rooms on
the sixth floor of the building were required
Taking the air at new stadium
to accommodate increasing demand for the
group’s accounting and business courses.
THE FIRST matches have been staged at the new home of football league club Colchester
Air conditioning systems have been
United. The 10,000-seat community stadium, built by Barr Construction, incorporates a
installed to provide a comfortable year-
range of features designed for the comfort of spectators and business users.
round environment for the growing student
Titon’s aluminium Trimvent TV4000 variable opening trickle ventilators and canopies
and staff numbers at the specialist centre.
have been installed with Kawneer 600 series windows at locations throughout the
From Panasonic’s FS range, two inverter
stadium, including the corporate suite area and IT support rooms.
controlled 6hp CU-L50DBE8 outdoor units
Titon’s range of window trickle ventilators has recently been expanded with improved
designs that assist in compliance with new ventilation regulations in England and Wales.
Aluminium and PVCu models are now available offering increased ventilation.
Low noise extractor for Rick Stein
RICK & JILL STEIN’S renowned Seafood Restaurant (pictured below) overlooks the
historic and busy fishing port of Padstow, Cornwall and the Camel Estuary. A recent
£2.5m refurbishment has included the expansion and refit of the restaurant to add a
further 30 covers, an expanded kitchen with new fish preparation area, grills, fryers
and wok burner, along with a new wine cellar and terrace.
Being typical of many Cornish buildings, the restaurant’s kitchen is situated
halfway below ground-level and with 16 guest rooms above the restaurant, noise
and two 3hp CU-L28DBE5 units support
levels of the extractor fan were a big consideration.
six 3hp CS-F28DB4E5 four-way 90 x 90
cassettes in the training rooms.
Programmed
An SLC 710 fan from the Elta Fans Select range was installed in an outside courtyard
Choice of temperature
area to provide extraction power to three canopies in the main kitchen. Elta
The two larger 12 x 5 metre rooms each
programmed the fan’s inverter controller on site to restrict extractor performance in
have a 6hp outdoor unit and two cassettes,
order to reduce noise levels for the comfort of guests in the rooms above.
while the two smaller rooms have a 3hp
High-efficiency impellers make the SLC an economical method of moving high
outdoor unit and one cassette – facilitating
volumes of air, at low to medium pressures.
different temperature choices in each
room. The cassettes have rated capacities
of 7.1kW cooling and 8kW heating and a
flow rate of 1,200m3/h in both modes.
Outdoor units are roof mounted, above the
seventh floor. a73
editorialcontacts
Daikin
www.daikin.co.uk/comfort
Elta Fans
www.eltafans.com
Honeywell
www.centraline.com
Kawneer
www.kawneer.com
Panasonic Air Conditioning
www.panasonic.co.uk
Titon
www.titon.co.uk
WindowMaster
www.windowmaster.co.uk
66 building forleisure November 2008
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76