AirUser 2008 96+4pp 23/7/08 16:51 Page 54
SECTION 4
Pipework
Air supply solutions across
a wide range of industries
ABOUT TESEO UK The Teseo HBS system is not subject to corrosion and the
Teseo UK supply the complete range of Teseo S.R.L.
system’s extruded aluminium square outer section provides
aluminium pipework systems for compressed air, vacuum,
additional structural strength and durability, over round
oils and inert gases, throughout the UK. Teseo S.R.L. are
piping. Like the AP system, the smoothness of the internal
the original designers and manufacturers of the HBS
surface ensures low air flow friction and guarantees high
pipework system, which in the UK has previously been
performance in terms of flow rate and pressure reduction,
marketed as ‘Simplair’.
significantly improving production.
Company name
TESEO AP AND AP MULTIFLUID PIPEWORK
Being quick and easy to install it allows for
SYSTEMS
more flexibility for modification
Teseo UK Ltd
Teseo AP pipework (15 bar max) is easy to install and
which can also be easily
particularly suited for compressor air distribution systems as
done by the client
Address
well as mainline drops. There is no special tooling required,
themselves, reducing
PO Box 9367,
simply cut and de-burr and clamp
factory downtime and
Witham, together. A full range of
labour.
Essex CM8 3WU preformed bends and swan
necks are available for
Contact details
quick and easy
Tel: 08701 672150
installation. NEW to the
Teseo Range of modular
Fax: 08701 672151
pipework systems is AP
uk@teseoair.com
Multifluid (25bar max).
www.teseoair.com
Simply by doubling the
Products
clamping brackets on
• AP aluminium
every single joint the AP
multifluid is capable of transporting
pipework system
fluids such as mineral and synthetic oil, cooling
• HBS hollow bar
and lubricating fluids at pressures up to 25 bar. A full
pipework system range of 25 bar fittings are available.
• ATS air track
supply system
The pipework is
• SAB swinging
highly resistant to
corrosion and has
ATS AIR TRACK
arm bracket
an extremely
SUPPLY SYSTEM
• WBA work bench
smooth bore, giving
Providing an ergonomic workplace
assembly system excellent air flow solution with health and safety at
characteristics; a
the forefront, Teseo’s ATS air
Literature
minimum of 30%
track supply system has been
A comprehensive
higher when
designed to complement its
compared to black
modular ranges of HBS and AP
range of literature
or galvanised steel.
compressed air supply lines.
is available on all
With a low
products
coefficient of
Accessories to the system
friction TESEO
include an anodised aluminium
Quality
smooth bore tubing
swinging arm and for the HBS
assurance
experiences less
50 system, a trolley that fits
friction and pressure drop when compared to steel tube,
directly onto the distribution
resulting in reduced power requirements, smaller pipework
line. There are also
and subsequent reduction of installation costs.
workbenches manufactured
from anodised aluminium
TESEO HBS HOLLOW BAR PIPEWORK SYSTEM
profiles which include ATS
Launched at PneuMotion in 2006 following European
systems for the tools and
success, the HBS 110 hollow bar system (15 bar max) is
one support leg pressurised
the largest HBS system available in the UK. It joins the
acting as both a reservoir
range which includes 25mm, 32mm, 50mm, 63mm and
and feed line.
80mm systems.
The 110mm HBS system is particularly suited to heavier
industries including aerospace engineering plants and
vehicle manufacturers, since its 125m
3
/min flow rate
capacity at 10 Bar is the equivalent to a 6 inch steel pipe.
ENTER 82959
www.airuser.com/enquiry
54 AirUser
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100