This page contains a Flash digital edition of a book.
FREE Servers,
FREE Applications,
FREE Floor space,
FREE Man-hours,
FREE Power,
FREE Storage...
Introducing the revolutionary enterprise architecture
that finally pays you back.
Legacy systems work fine for brute-force cooling the entire room, but skyrocketing
energy costs make them fiscally irresponsible and their fundamentally oversized design
makes them incapable of meeting today’s high-density challenges. Even worse, power
and cooling waste may actually prevent you from purchasing much-needed new IT
equipment. Simple problem, simple solution. Cut your power and cooling costs and use
the savings to buy the IT equipment you need.
According to Gartner Research, 50% of all data centres built before 2002 will be The Efficient Enterprise

makes cooling predictable and
obsolete by 2008 because of insufficient power and cooling capabilities. Power and/or reduces operational expenses by...
cooling issues are now the single largest problem facing data centre managers.
Employing close-coupled cooling. Our innovative
InRow

architecture allows a more efficient, targeted
There’s only so much power and money to go around
cooling by shortening the distance between heat
Your service panel limits the amount of power available. Your budget limits the amount generation and heat removal.
of money. You have to stretch every bit of both as far as you can. What you need is the
Containing the heat. Our Hot Aisle Containment
APC-MGE Efficient Enterprise

.
System reduces hot spots by preventing hot exhaust air
The APC-MGE solution offers modular scalability so that you pay only for what you use;
from mixing with cool air in the room.
capacity management so that you know where to put your next server; and dedicated Managing capacity. Intelligent, integrated capacity
in-row and heat-containment systems that improve cooling and thermal predictability.
management software gives you real-time data on your
An Efficient Enterprise earns you money through the pre-planned elimination of waste.
power and cooling demands.
For example, simply by switching from room- to row-oriented cooling, you will save, Utilising right-sized components. Right-sized “pay
on average, 35% of your electrical costs. as you grow” components mean no more wasting power
with oversized legacy systems.
Selecting an Industry-Standard
Metric for Data Center Efficiency
Download the APC White Paper: ”Selecting an Industry-Standard
Metric for Data Center Efficiency“ and get a chance
to WIN an APC Power Ready Messenger Bag!
Visit http://promo.apc.com Enter Key Code 64580t
Call 0800 2799 254 • Fax 0118 903 7840
©2008 American Power Conversion Corporation. All trademarks are owned by Schneider Electric Industries S.A.S., American Power Conversion Corporation, or their affiliated companies. All other trademarks are property of their respective owners. EE2A7EA4-UK
e-mail: esupport@apc.com Unit 1, Ground Floor, 250 South Oak Way, Green Park, Reading, RG2 6UG
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60
Produced with Yudu - www.yudu.com. Publish online for free with YUDU Freedom - www.yudufreedom.com.