This page contains a Flash digital edition of a book.
Contents | 1st QUARtER 2008
3 Editorial comment
Editor Cheryl Saponia
Offshore wind farms: breaking through the
Editorial Assistant Clare Nicholls
bureaucratic barriers
Design/Production Manager Sandy Defraine
Group Sales Director Debbi Bonner
4-8 News
Advertisement Manager Rosemary Little
Advertisement Production Manager Stephen Bell
4-5 News
Marketing Manager Adelaide Proctor
6-8 Equipment News
Publisher Mark J Staunton-Lambert
9 In-depth
Published by:
The Royal Institution of Naval Architects
9 Design | PSV icebreaker designed to
Editorial & Advertisement Office:
be green
10 Upper Belgrave Street
London SW1X 8BQ, UK
10-11 Vessels: Launch & Delivery
Telephone: +44 (0) 20 7235 4622
Telefax: +44 (0) 20 7245 6959
10-11 Fast crew supplier reduces slamming
E-mail editorial editorial@rina.org.uk
E-mail advertising advertising@rina.org.uk
12-20 Features
E-mail subscriptions subscriptions@rina.org.uk

Four issues published annually
Feature 1 Repair and conversion
12-13 More conversion contracts for
Printed in Wales by Pensord Press Ltd
Singaporean group
The Institution is not, as a body, responsible for opinions
13 North Sea first: flare tower repair
expressed in Offshore Marine Technology unless it is expressly
stated that these are the Council’s views.
14 FPDSO conversion underway
14 In-situ repair reduces downtime costs
Registered charity No. 211161
15 Pipe-laying project completed
© 2008 The Royal Institution of Naval Architects. This publica-

tion is copyright under the Berne Convention and the Interna-
tional Copyright Convention. All rights reserved. No part of
Feature 2 spars
this publication may be reproduced, stored in a retrieval system
16 The Perdido spar: certification ongoing
or transmitted without the prior permission of the copyright

owner. Permission is not, however, required to copy abstracts
Feature 3 Environment and renewable energy
of papers or of articles on condition that a full reference to
the source is shown. Multiple copying of the contents without
18 Class approval for new wind concept
permission is always illegal.
18 Windmills for offshore Europe
20 Government go-ahead for Wave Hub
ISSN 0306 0209
18
16
Approval in
principle has
been agreed for
this wind energy
Shell’s Perdido spar is concept.
being constructed by
14
Technip.
Repairs were recently carried
out on this vessel.
Offshore Marine Technology 1st Quarter 2008 1
OMT 1stQ 08 - p1.indd 1 11/02/2008 11:45:45
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24