This page contains a Flash digital edition of a book.
Letters
Case for gas turbines
Dear Editor, ated engines, for example, at about 20MW, one free extra gas generator, etc. Did he do his
I was very disappointed to read our compare very favourably with slow-speed through life costings?
President’s prominent, adverse comments heavy oil engines; particularly part load Yours faithfully,
on gas turbines (Profi le page 169, September performance.
2007, Th e Naval Architect). Ten years ago he Perhaps his fi tting LM2500 engines in Bob Barnes
may have had some justifi cation for saying QM2 was heavily infl uenced by the commer- (R H Barnes CEng, FIMarEST, MRINA)
so, but not today. Specifi c fuel consumption cial deal off ered by GE at the time, for which Director, Robert Barnes & Co, Consulting
of the RR WR21 intercooled and recuper- they are well known; buy two units and get Engineers, Naval Architects & Surveyors
FPSO hull design mistaken
Reference is made to the special feature design.’ Maritime Tentech AS) in AKET has designed
regarding. Korean Shipbuilding and the article Th is is totally wrong. more than 60% of all purpose-built FPSOs in
‘Off shore sector pays off for Samsung’ (page Th e Skarv FPSO hull is of a Tentech 975 harsh environmental conditions for the North
34, Th e Naval Architect, October 2007). design developed by Aker Kværner Engineer- Sea, and has more than 15 years operational
We (Aker Kværner Engineering and ing and Technology AS (AKET), where we experiences in these areas.
Technology AS/Norway) strongly react when have been responsible for the FEED phase
SHI claims that the Skarv FPSO hull is of its of the hull as well as the FEED and detail Børre Knudsen
design. engineering of the topsides and overall Aker Kværner Engineering and Technol-
Quote: ‘SHI developed the hull design at concept design. ogy
the FEED stage, as well as the overall concept Th e FPSO solution department (previous Vice president FPSO solutions
SeaTec provides services and products to meet the needs of the shipping, offshore and defence industries.
Originally formed in 1987 to provide ship inspection and superintendency services, we are continually expanding
and are now an internationally based project management, engineering and safety consultancy, providing
comprehensive services in support of new building, ship conversion, defence and offshore projects.
Due to our continued expansion with concept, new builds and conversion projects, we have vacancies for:
Project managers with a minimum of 10 years experience of working and leading multi discipline project team
with a naval architecture, marine or electrical engineering background.
Senior naval architects and marine engineer’s degree qualified with chartered engineer status.
New building site managers who preferably hold chief engineering certificates of competences with experience
of similar projects in Japan, Korea and China or Europe.
Design engineers (hull, machinery, outfitting) to undertake basic and production design work for new builds
and conversion projects with AutoCAD experience.
Safety Engineers, degree qualified with 5 years experience in undertaking formal safety assessment and
preparation of safety case submissions.
Estimator with 10 years of shipyard general estimating and cost control experience in commercial ship repair
and new building projects.
Please send your CV and cover letter for the attention of Mrs Shona Gallagher, Sea Tec UK LTD
or email shona.gallagher@seatec-services.com.
SeaTec UK Ltd, Skypark, 8 Elliot Place, Glasgow, G3 8EP, UK
Tel: +44 (0)141 305 1300 Fax: +44 (0)141 305 1301 Email: info@seatec-services.com Web: www.seatec-services.com
The Naval Architect January 2008 93
NA Jan - p92+93.indd 93 07/01/2008 12:51:57
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108