CONSULTANCY CONTRACTS: AMP4
Thames EARmarks drought plan
Thames Water Utilities commissioned Scott Wilson to complete
preliminary environmental assessment reports (EARs) for each
of its potential drought permit abstraction options as identified
in its draft drought plan. Thames Water has been using these
preliminary reports to prioritise baseline monitoring for AMP5
and complete its drought plan for publication in 2010.
Assessments were required for 23 options to enable Thames
Water to define potential impacts and prioritise a monitoring
programme to support any applications for permits during
future droughts. The options investigated included local
groundwater abstractions from the headwaters of the River
Thames, and each preliminary report identified:
Thames Water: preliminary reports
for AMP5
■ The main environmental receptors associated with each
drought permit abstraction and their sensitivity
■ Potential impact pathways between the abstraction and likelihood of use and environmental sensitivity
relevant receptors ■ An outline Environmental Monitoring Plan and Mitigation Plan
■ The environmental sensitivity of potentially affected for each Drought Permit option
receptors ■ Anticipated analysis that would be carried out when the full
■ A priority ranking of the Drought Permit options based on EAR is undertaken
Interserve Project Services Compliance Assesment programmes
Scottish Water
Environment Agency 4D
Q&S 3 Consultancy Services Lot 1
National Conrtactor Framework 2 Support to capital investment programme –
Severn Trent
Severn Trent Water
environmental analysis Leakage Detection
AMP4 Process Partnering Network Modelling
Thames Water Utilities
Mott MacDonald – Water Division Water Drainage Area Planning and Additional
Various contracts
Anglian Water
Consultancy Services
United Utilities
@One Alliance – joint venture with Grontmij for Water Mains Cleaning
AMP4 Framework Agreements general design services
South East Water
AMP4 Special Projects Framework Leak Detection Services
Kingsbridge Risk Solutions
Environment Agency South Staffs Water
Bournemouth and West Hampshire Water
Strategic Flood Risk Management Staff Secondment Framework
Bristol Water Northumbrian Water South West Water
Henley Water
AMP4 Consultancy Framework UWWD Sampling
Jersey Water OFWAT Southern Water
South West Water
AMP4 Engineering Consultancy Framework Utilities Service Contract
Wessex Water Scottish Water Thames Water
SR10 OPA Plan Lot 20 Leakage Detection
Land Use Consultants
Severn Trent Water
Lot 21 Leakage Detection
Thames Water
AMP4 Special Services Framework Lot 714 Engineering Design
UpperThames Reservoir: 2004-2009 (project
Southern Water Three Valleys Water
suspended) AMP4 Framework Leak Detection Services
Thames Water
Meter Reading Services
Metoc AMP4 Framework – Lot 19 Engineering & Lot 21
United Utilities
Anglian Water
Construction Management Professional Services and AMP4 Framework
Framework agreement for River and Coastal
United Utilities
(KMI+)
Modelling AMP4 PEC Framework
Yorkshire Water
Northumbrian Water Wessex Water
(CostainMouchel) AMP4 Clean & Wastewater
Coastal Flow and Quality Modelling and AMP4 Framework Network Modelling
Compliance Assessment programmes
Yorkshire Water
Scottish Water & Scottish Water Solutions
AMP4 Design & Build Framework through Mott MWH UK
Consultant to for coastal water quality programmes MacDonald Bentley
Northern Ireland Water
Subconsultant for catchment management planning Asset Management Services & Regional Project
United Utilities
Mouchel Management Framework
Flow and Quality River and Coastal Modelling and
Anglian Water Northumbrian Water
Compliance Assesment programmes Asset Planning Framework Framework consultant, AMP4 Engineering Services
Welsh Water Scottish Water Scottish Water
Flow and Quality River and Coastal Modelling and Water Consultancy Services Engineering and project management framework trianglert
February 2010 Consultant & Contractor File 13
Previous arrowPrevious Page     Next PageNext arrow        Smaller fonts | Larger fonts     Go back to the flash version
1  |  2  |  3  |  4  |  5  |  6  |  7  |  8  |  9  |  10  |  11  |  12  |  13  |  14  |  15  |  16  |  17  |  18  |  19  |  20  |  21  |  22  |  23  |  24