he
hey t
he span
om t
e t
43
ets. Horizontal
ile
ojections fr
es in mm.
ack
stem wher
All figur
all br
ing prof
all sy
iles using special clamps.
50
y w
of
tain w
han normal pr
t pr
Corner Blade
62
eater t
e. The spacing is determined b
Aluminium spr
20
e gr
he building b
25
ed to t
tile
ile
ix
3
40
he horizontal suppor
®
Type II
on
20
35
iles f
t rail
e prof
t rails
of
t angle substructur
4
t pr
astened to t
or ArGeT
31
al suppor
25
e f
29,5
ound
al suppor
tical suppor
43
is to be installed on to a unitised or cur
er clip f
izont
Type I
21
es. It may also be used wher
er
.25 m.
w
®
Lo
48
Hor
45
20
Half R
Aluminium joint edg
izont
on
he v
20
tiles, which ar
iles is 1
®
of
h hor
xtended centr
here ArGeT
ed onto t
on
ix
w
tical angle section supporer
e f
ArGeT
ular
e
3
40
ALLING
op
tructure wit
p
ed.
iles ar
f th
he horizontal pr
of
W
at o
t pr
60
orm
e desir
ethod is
e consists of v
form
AIN
rt m
all ar
43
T
tical sections may be at e
eight
er
al w
d h
tile
uppo
tile
Open Crucif
®
20
he v
®
on
tile
CUR
Aluminium subs
This s
of t
structur
The substructur
aluminium suppor
selecte
The maximum span of t
on
a20
20
tile
®
®
on
on
or ArGeT
or ArGeT
31
or ArGeT
34
or ArGeT
iles f
3
40
ile f
pper clip f
Centre clip f
39
U
40
48
60
x
43
uare Bo
Aluminium joint prof
Aluminium corner prof
Sq
he
®
ships
ame.
ork
on
xcellent
eT
tner
al fr
h e
ated in t
rG
y attributes
A
ets, angles and
ging par
een applications is
or
he structur
ack
tain wall, off site
e f
ms. Our versatile and
ainscr
ope it is wholly established
hese skills. Spacious and
e combined wit
al ar
her sealed joints.
h glazing incorpor
he line of t
eat
oviding t
chitectur
hin w
abrication ar
all or wit
xpanding in Eur
or sealed and r
minal project in Brooklyn, New Y
elling Ar
t.
loor outside t
actor and will combine br
er
ations to pr
tain w
ANELIZING
anspor
lections wit
orking and f
loor to f
al def
mance criteria. Speed of erection, construction
oad tr
for
heir oper
om f
or r
The Atlantic T
had a combination of unitised cur
panelized and in situ installation of the
terracotta.
Crawley Schools PFI in the UK used pre-glazed
prefabricated steel panels and insitu installed terra-
cotta. On buildings up to three floors that do not
suffer from access difficulties the best cost option
can be a combination of panelized walling and
insitu fixed terracotta using mobile scissor lifts or
mast climbers.
tain wall installations and our in-house design team
t systems are interchangeable to suit specific design
ed t
he design technology f
ed f
he specialist contr
or structur
anes, metalw
e gear
ted as a unitised cur
epar
e to t
CTURE & P
acturing to be maximised is e
A
eness of tar
anspor
. The suppor
verhead cr
e bespok
ovision made f
®
on
fsite manuf
h o
h aw
ying building codes nationally and T
hese techniques.
ar
e commonly pr
h pr
MANUF
or of
alls will span continuously fr
ame ar
he v
fering t
is to be tr
t systems enhance the flexibilty available to the fabricator to compliment their
ArGeT
®
n
he fr
can be selected for use in all recognised construction for
y companies who hav
acilities wit
s of
o
ication
®
A b
actor
on
he demand f
ArGeT
special skids ar
abr
ed to meet t
e
he US
h contr
f-site panelized w
OFFSITE
elded connections wit
Pref
ArGeT
unique suppor
specific panel designs and meet all per
without scaffolding, reduced weather delays and early enclosure are the primar
of panelized
requirements for panel or unitised cur
are available to provide assistance.
Whilst t
in t
mechanised f
finishing skills. An in dept
requir
wit
Wher
panels,
Of
Connections to t
w
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24