This page contains a Flash digital edition of a book.
Feature 7
As a result, in July 2006, the Ministry with industry partners of project costs, on project delivery, re-emphasising the
disengaged from the Swan Hunter contract delivery plans, assumptions, risks, and importance of the MoD and its commercial
and transferred design authority and lead opportunities partners routinely adopting such practices
yard services to BAE Systems. The second

Given that project personnel will change if they are to consistently deliver successful
Swan Hunter ship, Lyme Bay, was towed to during the life of the project, maintain a project outcomes.
the BAE Systems Govan yard for completion, comprehensive project history detailing The ‘Gold Standard’ work examines
and the Ministry of Defence settled the Swan the rationale underpinning key decisions practical evidence of how well factors
Hunter contract for a further £32 million.

That historic trend analysis can provide affecting the successful delivery of projects
Lyme Bay began sea trials on 15 June an important ‘sanity check’ on the realism are being managed by the Ministry of
2007, and was judged to have achieved of time and cost estimates Defence and what can be learned from
delivery standard on 27 June – nine weeks successful Ministry of Defence projects and
ahead of contract. The ship was handed over The NAO adds that these factors are those from commercial organisations and
on 2 August 2007, and accepted into service consistent with its ‘Gold Standard’ work overseas defence ministries. WT
(following formal transfer of operational
command to the Fleet) on 26 November
last year.
The NAO says that the Ministry of
Defence ‘deserves credit for successfully
delivering the vessels into service’, given the
earlier trauma. For their part, the Ministry
and BAE Systems have jointly completed
a case study on the LSD (A) experience
to demonstrate the benefits of closer and
more effective working relationships, and
the embodiment of commercial partnering
principles.
Notwithstanding the significant schedule
slippage, one aspect of the LSD (A)
procurement highlighted by the NAO was
the lack of realism in the Ministry over the
likely cost of the four-ship programme. It
commissioned HVR Consultants to produce
a cost estimating model for the procurement
(reflecting the two yard strategy), this
concluding that the contracted cost of the
project, at £596 million, fitted within the
INS
RENK
IDE.
likely range of contract prices for a project RENK marine gears of the WARP propulsion
of this type.
system for corvettes of the South African Navy
The NAO concludes that there are a
number of central factors in the successful >
MarineGearsfromRENK are setting standards with
recovery of the LSD (A) programme from
more than 30 naval units worldwide. With highly specialised
Vehicle
which the Ministry can draw broader
Transmissions
designs featuring double helical toothing, they combine a
lessons: Industrial Gears
maximum of speed (up to 60 knots) with a minimum of

Incentivise the achievement of the full
MarineGears
weight. They operate at extremely low noise levels and are
range of desired outcomes with the
SlideBearings
Couplings
extraordinarily reliable. From minesweepers to high-speed
intelligent use of contract terms and
TestSystems
patrol boats on up to the biggest frigates: RENK trans-
appropriate commercial arrangements
missions will give you superiority and security at sea.
that protect the contracting parties. These
should reflect the specific circumstances
of the project and the risks being assumed
by the Department and industry

Having good and timely visibility of
project progress supported by credible,
RENK Aktiengesellschaft • Gögginger Strasse 73 • 86159 Augsburg, Germany
Phone +49 821/5700-627 • Fax +49 821/5700-559
timely, and relevant metrics monitoring marine.augsburg@renk.bizwww.renk.biz
the performance, time, and cost baseline
RENK,a memberofMANgroup

Having a common understanding
Warship Technology March 2008 33
WT Mar - p31+32+33.indd 33 10/03/2008 12:56:40
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40