This page contains a Flash digital edition of a book.
04-31 NEWS:SPN Master pages 18/11/08 22:06 Page 11
spnnews
NEWS IN BRIEF
TYLO TO THE FORE IN
£2.5m refurb
A refurbished swimming pool is
the main feature of a £2.5m
TWO PRESTIGIOUS REFITS
refurbishment. At Tonyrefail
Leisure Centre in the Rhondda Two major commercial leisure
valley. It is part of a £6m refurbishment projects to
refurbishment programme to upgrade sauna and steam
improve leisure and pool facilities. room facilities at prestigious
The refurbishment of Aberdare leisure centres – the
Swimming Pool and Rhondda Roehampton Club in London
Sports Centre has been and the Old Thorns Golf &
completed ahead of schedule. Country Club in Liphook,
Hampshire – have been
completed by Leisurequip, in
NSPF awards association with Tylö through
scholarship funds Golden Coast.
The National Swimming Pool At Roehampton Club, work
Foundation has awarded $30,000 involved refitting the original
in Scholarships and Fellowships to wet facilities installed by
26 students. The programme Leisurequip three years ago.
helps Certified Pool/Spa Operator The previous Tylö ‘Excellent’
certification graduates pursue steam room was replaced with
further education. The committee the latest 8E ‘Elysee’ model,
approved $26,000 in scholarships from hard-wearing durable
to 24 students who are pursuing vacuum-formed special-grade
higher education. The students white plastic panels and
are from around the US, pursuing seating to cope with 100%
college degrees in a variety of humidity during the bathing
subject areas. cycle.
The Old Thorns Golf &
Country Club in Liphook
New pool for Seaton? added a new first-floor storey
A new swimming pool in Devon is to the original premises,
being considered as the incorporating a glass walled
replacement for the demolished gymnasium overlooking the
Seaton pool. The pool, used by 18-hole golf club. The original
100,000 people annually, closed in sauna and steam rooms were
The Roehampton Club facility refit
April 2006 after the Labour removed, with their
administration heard it was costing replacements re-sited adjacent
the council, which rented the site, to the swimming pool. sauna cabin, with alder wood
£160,000 a year. The building was Leisurequip installed a internal walls and three
GOLDEN COAST
demolished. It left the city with two matching floor-to-ceiling benches, and a 9FCR eight seat
telephonesolid 01271 378100
indoor pools, at Central Park and glazed Tylö ‘Alu-Line’ 225 ‘Elysee’ steam room.
pc www.goldenc.com
Plympton; and two summer-only
outdoor facilities: Mount Wise and
Tinside, plus the Pavilion’s fun pool.
BioLab support for Hot Tub people
£4.5m boost for The Hot Tub People’s new testing system with one of information on Active Oxygen
Yorkshire pools showroom in Bristol opened in BioLab’s Alex Software Labs. products such as the Bayroklar
Another £4.5m is to be pumped style with a wide range of The system calculates any Spa Tablets.
into the scheme to build new models on display and adjustments that the customer
swimming pools in Yorkshire enthusiastic customers on hand. might need to improve their
bringing the total cost up to The two day event was a water quality and extend the
nearly £11m. It means instead of success with the Mayor of lifespan of their spa, giving the
just 25-metre replacements, they Bristol officially opening the customer a detailed print out
will also get integrated learner showroom. Representatives with any remedial action
pools, fitness suites and cafes. from BioLab UK attended, together with dosing
The original £6.5m cost will Catherine Reid, Account instructions for their spa. The
come from the sale of shares in Manager, as well as Juergen system also details the routine
Leeds Bradford Airport. Koenig the Commercial Director steps that customers should
The pools will open in 2010. to answer technical queries. follow to keep their spa water
Sowerby Bridge pool in Watson Catherine Reid gave advice quality maintained, increasing
Mill Lane is 100 years old and on BioLab’s SpaGuard range customers confidence that they
Brighouse pool closed three years which is supported by the Hot are looking after their spa well.
ago because of structural problems. Tub People, as well as give The following day Juergen
guests the opportunity to bring gave Lewis Salvidge and his
in their spa water samples which team support and advice where
Catherine ran through the water needed, and was able to offer
Visit our website at www.swimmingpoolnews.co.uk DECEMBER 08 swimming pool news 11
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100
Produced with Yudu - www.yudu.com