This page contains a Flash digital edition of a book.
Thistle DPS.qxp 27/10/2008 12:13 Page 3
Advertisement Feature
Thistle Generators supplied,
installed & commissioned 2
x 250kVA generating sets at
the Bank of Scotland
Glasgow Chief Office early
in 2008.
and, above all else, to bring Scottish Water & competitors serves to upgrades. However, our
more value to our Thistle Generators highlight the clearly expertise is not limited to
customers. Thistle Generators are unrivalled levels of service working with FG Wilson
suppliers to the Scottish delivery and customer generating sets and our
The NHS & Thistle Water Framework for the satisfaction that we are teams have extensive
Generators supply, installation and consistently able to achieve. experience working with
Thistle Generators have commissioning of standby almost every engine
been working on NHS sites diesel generators and have After Sales’ Service manufacturer. Regardless of
across the UK for over 40 installed in excess of 20 Thistle Generators skilled make, model or age – we
years and in that time we Mega Watts of standby service team are available have the facilities and
have developed an absolute generation at various sites 24/7 to respond to any capabilities to overhaul,
understanding of the client’s across Scotland in the emergency situations that upgrade or maintain every
needs and requirements. duration of the contract. arises. With comprehensive type of generating set.
We are currently carrying Thistle Generators was spares readily stocked we Thistle Generators’
out installations at Aberdeen recently awarded the ensure that equipment is knowledge of the spares
Royal infirmary and St prestigious accolade of back to optimal condition in market enables us to
Andrews Health Centre for “Supplier of the Year 2008” the shortest period of time. provide the most
Aberdeen based Richard by Scottish Water in Thistle Generators service competitive prices for
Irvin Building Services as recognition of the capabilities not only cover current equipment, as well
well as an installation at outstanding and consistent planned and preventative as source the most difficult
the Southern General Neo- service levels achieved maintenance but also to obtain equipment from
Natal Unit in Glasgow on during the first half of the incorporate complete our extensive network of
behalf of Scottish Hydro current 4 year Framework generating set overhauls parts stockists.
Contracting. Agreement. The competition and upgrades. Our electrical So if you want to use a
In total we have in was incredibly fierce and and mechanical specialists generator company that is
excess of 35 Mega Watts of from major international can breathe new life into ranked Number 1 by a blue
standby power currently corporations, such as old or out of service chip organisation like
being installed at NHS Siemens and Finning-Cat, equipment and are fully Scottish Water; outstanding
locations throughout the UK who are also current capable of carrying out amongst 200 other quality
on the largest PFI Projects suppliers for Scottish Water. extensive maintenance – suppliers, then you simply
being undertaken by the Thistle Generators ability to from complete engine have to choose Thistle
NHS to date. outperform these rebuilds to control panel Generators.
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48
Produced with Yudu - www.yudu.com