This page contains a Flash digital edition of a book.
Rooflights & Roof Trusts
SPECIFICATION
PRODUCT UPDATE
Sunsquare Ltd
Simpson Strong-Tie
Winchester Road, Cardinal Point, Tamworth, Staffordshire B78 3HG
Tel: 0845 226 3172 Fax: 0845 226 3173 Tel: 01827 255600 Fax: 01827 255616
Email: info@sunsquare.co.uk Website: www.sunsquare.co.uk Website: www.strongtie.co.uk
High Specification Skylights Simpson Provides a Perfect Fit for Regularised Timber
Sunsquare Ltd manufacture a range of high specification flat With regularised timber taking hold across the building
roof skylights. Our range of products provide solutions for industry, demand is fast growing for builders across the UK to
skylights requiring maximum daylight, natural ventilation, roof- get their hands on hangers to fit these re-sized products. In
top access and solar control.Add to this our range of walk-on response to this growing trend Simpson Strong-Tie has
skylights and aesthetically pleasing pyramid skylights, you can extended both its range of timber to timber (JHA) and timber to
see that Sunsquare Ltd have solutions for introducing natural masonry (JHM) hangers to fit 47mm and 91mm variants.
daylight to every area of a flat roof. Should you wish to discuss Specially designed to accommodate the reduced size of solid
your current or future projects for feasibility, design or pricing timber joists, both new products are available from major
purposes please contact a member of our friendly team. builders’ merchants across the UK and are already selling fast.
Click here to request literature Click here to request literature
System Building Vacuum Lifting
Wernick Buildings Ltd
Nidum Works, Neath Abbey, Neath, SA10 7DS
Tel: 0800 181822 Fax: 01792 321400
Email: sales@wernick.co.uk Website: www.wernick.co.uk
AL-Vac UK Limited
Tel: 01202 668001
Wernick Builds Another Dialysis Unit Website: www.al-vac.co.uk
The Hayes Cottage Hospital Renal Dialysis Unit has been
designed to meet the NHS’s strict guidelines and owner John
AL-Vac’s Ceiling-Mounted Unit Moves Flexibly Over
Fordham’s vision of a user-friendly, open-plan design which
Extensive Work Areas
patients would appreciate. Designed and built by modular Ever wished your floor-standing lifting unit had a longer reach?
specialists Wernick Buildings the two-storey, 829m
2
, 24-station For operations working on long conveyor belts or work
unit is constructed from 37 factory built modules. These were benches, safe lifting and handling of heavy or bulky items can
delivered and craned into position in four days. Fitting out took be a headache when floor-standing lifting units just don’t have
just eight weeks. John considers the end result to be, "Brilliant. the necessary reach. Fortunately, lifting specialist AL-Vac has
The internal finish is vitally important in this environment and developed an effective solution: a ceiling-mounted vacuum
Wernick have achieved a look that is aesthetically pleasing, lifting unit with flexible movement to enable it to operate
efficient in use and easy to keep medically clean". safely over extensive work areas.
Click here to request literature Click here to request literature
11
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40